Most schools buy a batting cage reactively — under pressure, wrong spec, wrong dimensions, and the problems compound every season after. This guide is for athletic directors who want to...
Built to Your Wall
Wall padding is never a catalog item — it is cut to the run of your wall, to the height your code requires, with openings around every door, switch and extinguisher on it. Send us the measurements and we will have it built. No size limits, no minimum order, quote back within 24 hours.
Linear feet per wall, the height you need, and what is mounted on it. Photos of each wall from a few metres back cover most of what we need.
Your measurements go to the manufacturer and we come back with a written quote covering the pads, the mounting hardware, and freight to your ZIP code.
Approve the quote, send a PO or pay by card, and the pads go into production cut to your wall.
Fill in whatever you know. Anything you are unsure of, pick “Not sure” and we will work it out with you.
There is no stock size for wall padding — every run is cut to the wall it covers. Expect around 30 days from the point you approve the quote, then freight on top.
The quote includes the fasteners or Z-clip rails matched to your wall construction. This is why we ask what the wall is made of — the wrong anchor on installation day is the most common delay on a padding job.
Both quoted separately from the padding. Padding on masonry is usually within reach of a capable maintenance team; steel framing and anything above standing height generally is not. Some manufacturers install directly, and where they do not we connect you with an installer.
Pad height is set by what happens in front of the wall. Most gymnasiums run one height along the main walls and go taller in the areas where players actually collide with them.
| Height | Typically specified for | Why |
|---|---|---|
| 4 ft | Elementary gyms, multipurpose rooms, corridors | Covers the impact zone for younger students without padding more wall than necessary. |
| 5 ft | Middle school gyms, rec centres | A step up where the players are bigger but the pace is still moderate. |
| 6 ft | The standard for most high school gymnasiums | Covers a running adult at full speed. This is the height most schools order along the side walls. |
| 7 ft to 8 ft | End walls, behind baskets, competition courts | Where players come off a drive at speed and leave the floor. Taller coverage behind the baseline is the most common upgrade. |
Some districts and state associations set their own minimums for competition courts. If yours does, tell us on the form and we will build to it.
The pads are the easy part. How they attach depends entirely on what is behind them, and getting this wrong is the most common reason a padding job goes sideways on installation day.
| Wall type | What it means | Notes |
|---|---|---|
| Concrete block or poured concrete | The most common gym wall | Straightforward. Anchors into masonry, holds well, no backing needed. |
| Brick | Similar to block | Fine, but the mortar joints matter. Tell us if the brick is old or spalling. |
| Drywall over steel or wood studs | Found in newer buildings and multipurpose rooms | Pads must land on studs, not just board. We need to know the stud spacing. |
| Steel or structural framing | Field houses, converted spaces | Usually needs a different fastener and sometimes a sub-frame. Worth a photo. |
| Not sure | More common than you would think | Send a photo of the wall and a close-up of any existing fixing and we will identify it. |
Two mounting methods: direct mount, where the pad fixes permanently to the wall, and Z-clip or lip mount, where the pad lifts off a rail. Schools usually choose the removable version so pads can come down for repairs, painting or events.
This is the part people forget, and it is the part that delays a job. Padding is manufactured to your wall, which means every obstruction has to be in the drawing before it is cut.
Walk the wall with a tape measure and list everything on it. A phone photo of each wall from a few metres back covers most of it, and you can attach those to your email once the form comes through.
Round up rather than down. It is far easier to trim a pad run than to discover you are two feet short on installation day.
No. Pads are manufactured to your wall, in whatever run and height you need. One wall or an entire facility, we quote it the same way.
No minimum. If you need a single pad behind one basket, that is a quote we will write.
Around 30 days from the point you approve the quote. The pads are cut, foamed and covered to your measurements, then they ship freight. Some manufacturers run longer and we will tell you which one you are dealing with before you commit.
Many districts and building codes require flame-resistant covering on anything mounted to a gymnasium wall, and some specify a rating explicitly. If yours does, say so on the form and we will make sure the quote meets it and comes with the documentation your business office will be asked for.
Yes. Logos, lettering and school names are applied to the pad covering, and a padded end wall is one of the better places to put a mascot. Tell us on the form and we will ask for your artwork — vector files work best, but we can work from what you have.
Yes, but the covering has to be rated for it. Outdoor padding on dugouts, fences and backstops uses a UV and weather-resistant vinyl. Indoor covering put outside will fade and break down. Tell us where it is going and we will spec the right one.
Some manufacturers install directly. Where they do not, we connect you with an installer who does this work. Padding on masonry is within reach of a capable maintenance team; steel framing and anything above standing height generally is not. Either way, installation is quoted separately from the padding, the same as freight.
Yes. Tell us on the form that you will be paying by PO and we will build the quote so your business office can process it.
Outfitting a whole gym rather than one wall? We will quote the padding, the curtains and the equipment together on one document.
Schools & facilities